
The architect company A-lab solved a complex construction with BIM
Advanced BIM modeling made it possible to construct a 65.000/117.000 m2 commercial building complex, the Statoil building at Fornebu, Norway, in only 20 months on site.
Lue lisääCedervall needed a CAD and BIM advisor. Main issue: Moving from 2D to 3D and from there to Building Information Modelling.
Symetri Consultancy in the right methodologies using the programs Revit, Solibri, Naviate and BIMeye.
BIM Methodology development: